ENG_337300.XML
F71
Inspections for converters
In general, every converter that leaves the factory is subjected to a routine test under load conditions. The converter is therefore preparameterized. This assures the high quality standards of every SINAMICS G180 converter. Option F71 also allows further tests to be performed, also with the customer present.
Inspections for converters
|
Option
|
Routine test under no-load conditions with the customer present
|
F71
|
Option description
|
|
- Check of the mechanical system and the touch protection
- Check for completeness
- Check of equipment (components)
- Check of cables
- Check of customer documentation
- Check of power supply
- Check of fans
- Check of equipment identifier
- Precharging test
- Function check of the converter control
- Function check of protective and monitoring devices (simulation)
|
✓
|
Submission of the inspection report
|
✓
|
With customer present
|
✓
|
We can offer further tests under no-load conditions on request that are not included in the respective inspections at an additional charge. It is important to note that if the scope of the tests change, the prices for the individual inspections can change significantly, which is why we request prior consultation with the factory.